Tuesday, November 23, 2010

My Bathroom

So, the second floot bathroom is where all the mischief began. The water source to the toilet came loose from the wall the day after I tiled the floor, flooding the second floor, first floor and basement. A month later, after the dry-out contractor took his last fan away and I got past the funk, I was able to get back to work.

After glazing the tub, I stripped the window so I could finish it. It looked really good, hard to tell from these pix. I took them with my iPhone.


Next I stripped and finished the wood trim for the doorway. I said strip. He he he. Notice, there's a whole lot less paint, etc left over on the wood. Getting better with time.

Diane noticed the missing face plate. Details, details. Guess I'm not perfect.



Here are views of the other three walls when finished: the medicine cabinet, the window wall, and the mirror wall.